Sometimes we find that a Production/Process order is not getting costed. Or a material is not getting costed. There are certain settings where we can check for the problem. Basically this document is to understand where we can check with respect to PP to overcome the problem.

Check1:

In material master costing 1 view “Do not cost” should not be checked.

pastedimage_0_354630-7696028

As well the price should be maintained in Accounting1 view.

pastedimage_1_354631-7814657

Check2:

In OS20 the usage should be cost relevant.

pastedimage_2_354650-2885896

Check3:

Check in OS21 the setting is relevant for costing or not.

pastedimage_3_354651-2160107

Check4:

In customizing (OS22) the usage should be cost relevant.

Though it is a standard setting. It’s better to check for any customized usage.

pastedimage_4_354652-8118675

Check5:

In work center capacity tab page the capacity should be formula related.

pastedimage_5_354653-1976411

As well is costing tab page formula should be maintained.

pastedimage_6_354654-5520674

In KP26 the activity price should be maintained to calculate as per the formula.

Check6:

In OP00 or OP67 check the control key is cost relevant.

pastedimage_7_354655-3178972

Check7:

Check on OP35 performance efficiency rate whether it is 100. Then it will capture the full cost.

pastedimage_8_354656-1975299

Check8:

Check in the BOM item in status/Lng text for cost relevancy. Though it is coming from customizing but can be changed in BOM itself.

pastedimage_9_354657-5442345

Check9:

In general data of Routing/Recipe relevant for costing indicator should be checked.

pastedimage_10_354658-6982437

I think this many check will help us to provide the solution to our costing colleague.

Please add if you have any more point